Case study 03 · CDK Global · Dealer Onboarding
MyInstall 3.0 dealeronboarding
Consolidated four PRDs, 36 narratives and a workshop into one traceable flow, IA and prototype, in two weeks.
Role
UX and product design lead
Timeline
Jul 1 – 15, 2026
Team
Onboarding product, implementation and cross-team workshop stakeholders
The short version
The problem
Dealer onboarding lived in fragments: PRDs, a workbook, flow maps in progress and tribal memory. Everyone knew part of it.
What I owned
One honest picture of onboarding, where every claim traces to a source, and the prototype to prove it.
The approach
Consolidate, prototype, then let a cross-team workshop correct it. Four corrections from that room now govern the design.
The result
A 12-stage flow, a clickable IA and a prototype across three separated surfaces, handed off with six decisions named.
The long version · for the detail-inclined
02 / 11 · By the numbers
T H E G O A L One honest, traceable picture of onboarding When this sprint started, MyInstall's end-to-end story lived in fragments — PRDs, a discovery workbook, flow maps in progress, recordings, and tribal memory. Success meant consolidating all of it into artifacts a stakeholder can point at, where every claim traces to a source. 3 Surfaces separated: Admin · Dealer · Control Panel 36 Functional narratives consolidated into requirements 109 Current-state pain points carried as evidence 9 Golden-thread stages ordering the entire IA Success meant every gap is named on the artifact — never papered over with invented design.
03 / 11
Four stages, as they actually happened
04 / 11
What was gathered before design started
05 / 11
What the workshop changed
06 / 11
Four corrections that now govern the design
07 / 11
One prototype, three audiences
08 / 11
The governed submit → review → unlock loop
09 / 11
The reference layer around the prototype
10 / 11
Two weeks, one thread
11 / 11